乱子伦av无码中文字幕,欧美亚洲国产一区在线,久久99国产综合精品女人,日本区三区免费精品视频在线播放

濟(jì)南蓬發(fā)建材有限公司為您提供臨邊護(hù)欄、木工防護(hù)欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請(qǐng)關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機(jī): 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://www.7fjbwndm.cn/

地址:山東省濟(jì)南市章丘圣井工業(yè)園

當(dāng)前位置: 首頁(yè) > 新聞中心 > 公司新聞

木工加工棚的施工設(shè)置內(nèi)容點(diǎn)

來源:http://www.7fjbwndm.cn/   發(fā)布時(shí)間:2022-10-20

木工加工棚是為了保護(hù)施工現(xiàn)場(chǎng)的施工人員,用鋼管作為支撐框架,用竹簽或竹笆板或廢棄模板覆蓋作為防砸,或保護(hù)高壓線等穿過木工加工棚的東西。下面來講講木工加工棚的施工設(shè)置內(nèi)容點(diǎn)。
The woodworking shed is designed to protect the construction personnel at the construction site. Steel pipes are used as the support frame, bamboo sticks, bamboo fence boards or waste templates are used to cover the woodworking shed to prevent smashing, or high-voltage lines and other things passing through the woodworking shed are protected. Next, we will talk about the safe construction setting of the woodworking shed.
一般雙層保護(hù)是為了增加系數(shù),鋼筋加工棚和通道均為木工加工棚,部分木工加工棚建在塔吊覆蓋的辦公和生活區(qū)。木工加工棚是建筑施工過程中操作人員或人行的必經(jīng)通道,過往人員的木工加工棚為雙層。
Generally, the double-layer protection is to increase the safety factor. The steel bar processing shed and the safe passage are both woodworking sheds. Some woodworking sheds are built in the office and living areas covered by tower cranes. The woodworking shed is a necessary passage for operators or pedestrians during the construction process, and the woodworking shed for passers-by is double-layer.
從懸挑腳手架的懸挑處開始,每隔十米設(shè)置一個(gè)木工加工棚,可以更好地保證木工加工棚下行走人員的。在施工過程中,在搭建木工加工棚時(shí)注意防護(hù)措施,施工人員按照施工要求進(jìn)行施工,露天攪拌機(jī)位置、現(xiàn)場(chǎng)混凝土攪拌機(jī)、卷?yè)P(yáng)機(jī)棚、鋼筋棚、木棚、部分出入口和現(xiàn)場(chǎng)廁所需要設(shè)置木工木工加工棚。
Starting from the cantilever of the cantilever scaffold, a woodworking shed shall be set every ten meters to better ensure the safety of people walking under the woodworking shed. During the construction, pay attention to the protective measures when setting up the woodworking processing shed. The construction personnel shall carry out the construction according to the construction requirements. The woodworking processing shed shall be set up at the location of the outdoor mixer, the site concrete mixer, the winch shed, the reinforcement shed, the wood shed, some entrances and exits and the site toilet.
木工加工棚
水平保護(hù)安裝和拆除前,進(jìn)行技術(shù)交底。高空作業(yè)人員經(jīng)過專門的技術(shù)培訓(xùn)和專門的考試,并持證上崗。木工加工棚使用的鋼管、扣件等材料符合JGJ130-2011《建筑施工扣件式鋼管腳手架技術(shù)規(guī)范》及相關(guān)標(biāo)準(zhǔn)的要求。
Safety technical disclosure shall be conducted before installation and removal of horizontal protection. High altitude operation personnel shall receive special technical training and examination, and take up their posts with certificates. The steel pipes, fasteners and other materials used in the woodworking shed shall meet the requirements of JGJ130-2011 Technical Code for Safety of Coupled Steel Pipe Scaffolds in Building Construction and relevant standards.
安裝和拆除水平木工加工棚時(shí),操作人員的“三寶”齊全并正確使用。木工加工棚搭設(shè)和拆除時(shí),應(yīng)避免上下同時(shí)作業(yè),錯(cuò)開作業(yè)時(shí)間。安裝和拆除木工加工棚時(shí),所有材料和工具應(yīng)堆放在建筑物外緣少2m處,堆放高度不得超過1m。
When installing and removing the horizontal woodworking shed, the operator's "three safety precautions" shall be complete and used correctly. When erecting and dismantling the woodworking shed, it shall be avoided to work up and down at the same time and stagger the operation time. When installing and removing the woodworking shed, all materials and tools shall be stacked at least 2m away from the outer edge of the building, and the stacking height shall not exceed 1m.
拆除的材料及時(shí)傳遞到地面并運(yùn)走,嚴(yán)禁高空拋擲。建造和拆除木工加工棚時(shí),應(yīng)在地面上設(shè)置警戒區(qū),并派專人監(jiān)控。建造和拆除木工加工棚時(shí),應(yīng)指定專人指揮。
The dismantled materials shall be delivered to the ground and transported away in time, and it is strictly prohibited to throw them at high altitude. When building and removing the woodworking shed, a warning area should be set on the ground and a special person should be assigned to monitor it. When building and dismantling the woodworking shed, a specially assigned person shall be assigned to command.
管理人員應(yīng)注意眼、腿、口,采取有效的防護(hù)措施應(yīng)對(duì)危險(xiǎn)情況,確保人員。在雨天和大風(fēng)天氣,應(yīng)暫停木工加工棚的搭設(shè)和拆除,并檢查和維護(hù)木工加工棚的質(zhì)量。
The management personnel shall pay attention to the eyes, legs and mouths, and take effective safety protection measures to deal with the dangerous situations and ensure the safety of personnel. In rainy and windy days, the erection and removal of woodworking shed shall be suspended, and the quality of woodworking shed shall be inspected and maintained.
木工加工棚搭設(shè)完成后,經(jīng)專職員驗(yàn)收合格后方可投入使用。在搭設(shè)和拆除水平防護(hù)前,進(jìn)行技術(shù)交底。關(guān)注我們http://www.7fjbwndm.cn,為你講解更多的相關(guān)內(nèi)容事項(xiàng)!
After the woodworking shed is erected, it can be put into use only after being accepted by the full-time safety officer. Safety technical disclosure shall be conducted before erection and removal of horizontal protection. Follow us http://www.7fjbwndm.cn , explain more relevant contents for you!

探索| 襄垣县| 翼城县| 普安县| 侯马市| 科技| 墨竹工卡县| 天水市| 井冈山市| 淅川县| 即墨市| 防城港市| 邻水| 湘潭市| 洞口县| 白山市| 鸡西市| 康保县| 都江堰市| 城市| 油尖旺区| 嘉善县| 即墨市| 克拉玛依市| 肥乡县| 建平县| 阳谷县| 桂平市| 北宁市| 涟源市| 巩义市| 公主岭市| 灌云县| 冕宁县| 清新县| 大理市| 环江| 锦屏县| 临漳县| 卢氏县| 石渠县|